STAGE 03 · FEASIBILITY

Build the right prototype

Build only what is needed to answer the highest-risk technical, clinical, and usability questions.

Typical horizon3–12 months
Common capitalPre-seed · accelerators · SBIR/STTR
Illustrative spendOften $100K–$1M

How to know you are here

A physical, digital, or hybrid prototype exists
The prototype is being used to answer defined feasibility questions
Major technical and use-related risks remain open

What must be managed together

Evidence

Bench feasibility, simulated use, engineering characterization, and early usability evidence.

Regulatory

Use the pathway and risk assumptions to guide materials, software, testing, and documentation.

Capital

Pre-seed · accelerators · SBIR/STTR. Often $100K–$1M.

Priorities for the next 90 days

  1. 01

    Define the question and acceptance criterion for every prototype

  2. 02

    Run representative bench and simulated-use testing

  3. 03

    Begin the risk file and trace important design decisions

  4. 04

    Separate proof-of-principle features from commercial requirements

Required outputs

  • Prototype build and test records
  • Feasibility evidence package
  • Preliminary hazard analysis
  • Early usability findings

Common failure modes

  • Polishing a prototype instead of retiring risk
  • Uncontrolled iteration with no design history
  • Testing in conditions that do not represent actual use
THE DECISION GATE

Does the core mechanism work reliably in representative conditions, with manageable risks?

Do not advance because time or money has been spent. Advance when the evidence supports the decision.

NEED A COMPANY-SPECIFIC ROADMAP?

Turn this orientation into a milestone plan.

SECUIA can connect product, evidence, regulatory, usability, and financing decisions around your actual technology.

Call SECUIA